Laying a soldier course around a curved garden wall ate up most of my Saturday
I told the homeowner in Fort Wayne I'd have the little curve wrapped up in an hour, but the radius was tighter than it looked on paper. My outside joints kept opening up past 3/8 inch, so I ended up cutting every unit on the wet saw instead of snapping them, and that meant walking back and forth to the truck about 20 times. By the time I got the bond right I had over 6 hours in a wall that should've been done by lunch. Next time I'm making a plywood template off the footing before I order a single pallet, but does anyone have a better trick for keeping the bond tight on a radius like that?