PSA: half a course of brick on a ladder in the rain nearly cost me my knee in Tulsa
I had a 4 foot level and a full hod up top when the rung went slick, so I dropped the brick and grabbed the rail with both hands instead of trying to save the load, and after icing my knee in the truck for 20 minutes I called the GC and told him we're not laying another course till the scaffold gets moved; who else has eaten this one and what did you say to your builder when he pushed back on the delay?