Why does everyone skip the head joint on the first course?
I've been laying block for 14 years and I swear the most common mistake I see on side jobs is guys rushing the first course and leaving the head joints half filled. Last month I tore out a 30 foot retaining wall in Fort Worth that a crew put up six years back, and you could push a screwdriver a full inch into the vertical joints near the base. Water gets in there, freezes, pushes the block out, and then it's your wall leaning like a drunk on the sidewalk. The fix takes maybe ten extra seconds per block with a trowel full of mortar, just butter both sides and shove it home. Any of you run into this on other people's work, or is it just me noticing it?