Thought engineered beams were overpriced until the lumber yard quote came in
I was dead set on solid 2x10s for my garage addition in Cedar Falls until the quote came back at $1,340 versus $890 for LVLs. Two months in and the floor upstairs is dead flat, no squeaks at all. Anyone else switch after a price tag made the call for them?