Vent: spent 4 hours fighting a stair stringer layout that should've taken 40 minutes
Kept coming up short on my riser cuts because I was measuring from the wrong reference line on the ledger, and by the time I caught it my pencil marks were a mess. Do you all snap a fresh line every time or just trust one long reference and work off that? Trying to figure out if I'm overcomplicating it or if the single-line method really holds up on old crooked floors.
Man, I feel this. What saved me was snapping a fresh line right at the top of the stringer and checking it against the floor at a couple spots before I cut anything. Old floors are never level so one long reference will lie to you somewhere, ask me how I know.