TIL a 1/4 inch slump change can move your mix water by like 15 gallons, and I had it backwards
I always figured slump was mostly a water thing, so if it looked wet it was wet. Then last month I read a batch plant sheet from a pour in Fort Worth and it showed a 1/4 inch slump bump costing about 15 gallons per load. That number stuck with me. What got me was the sand moisture part, they were adjusting water by sand readings every couple hours and I never thought that mattered much. I used to eyeball it and add a splash when a load came in stiff. Now I ask the driver what the plant set the water at before I touch anything. Has anyone else seen a load go bad just from wet sand eating up the water budget?
Did you ever watch them dump a load that looked fine and then watch it set up on you in twenty minutes? We had a slab pour last summer where the sand was pulling way more water than the plant sheet said, and every truck got a splash added on site. By the last couple loads the mud was stiff as a board before we got halfway across the pour. Now I ask the batch guy for the sand moisture number before I let anyone touch the water.