Why does nobody talk about how concrete pumping got faster on my site in Phoenix?
Three years ago we had to wait around 45 minutes just to set up the boom pump for a small pour on a job in Phoenix. Now the same crew shows up with a remote control setup and they're pouring in under 15 minutes. The big change was switching from manual outrigger leveling to those laser guided systems that basically do the leveling for you. I watched a guy run the whole thing from 80 feet away last week while eating a sandwich. Has anyone else seen this kind of jump in setup time or is it just the newer equipment?