The rigger at the Fontana job taught me a 30-second trick for reading a load chart
Two weeks ago I was setting trusses at a job in Fontana and a rigger named Dave noticed me eyeballing the load chart like it was a menu. He walked over, put his finger on the capacity line, and said "you're reading the whole thing, just find your radius and go straight up." He showed me how to trace the boom length column first and then slide across to capacity, and it clicked in about 30 seconds flat. I've been doing it that way on every pick since and I finish the chart check way faster than before. Curious if that's how everyone else was taught or if I just missed something obvious in my cert class.