I finally had a clean install day at the Lakeview job and I keep waiting for the catch
I'm not trying to jinx myself here but last Thursday at the Lakeview job was about as smooth as it gets. Showed up around 7:15, panel and keypad rough-in went in without me having to fish a single wall, and the 4 door contacts all lined up first try. The homeowner had actually cleared the closets like I asked, which never happens, so I wasn't pulling clothes out of the way to get to the frames. Siren and strobe went up in the attic without me eating insulation for once, and I was done by 2pm instead of the usual 5. I even had time to run a full walk test and re-label the zone list before I left. Now I'm sitting here wondering what I did differently or if it was just dumb luck. Do you guys ever get a day like that and feel weird about it, like something's waiting to go wrong?