🎙️
0

That Tuesday when every panel in Bellevue threw a fit at once

Last month I had a day where three residential jobs back to back had panels showing false alarms. First one was a DSC at a split level, turned out the transformer was loose. Second was a Honeywell where the battery had corroded the pins clean through. Third was a Qolsys where the motion sensor was catching a ceiling fan reflection. None of the failures took more than an hour to fix, but the drive time between Bellevue and Redmond ate my whole afternoon. Anyone else got weeks where the hardware just decides to fail in groups like that?
1 comments

Log in to join the discussion

Log In
1 Comment
cole356
cole35610d ago
That corroded pins bit is wild... never seen a battery eat through metal that clean in under a year, usually that takes way longer.
4