Serious question, the wing wall on my retaining job in Tacoma bowed out 2 inches after the first rain
Poured a small retaining wall back in March with a 4 foot wing on the driveway side and it looked dead straight when I stripped the forms. After that big rain two weeks ago the wing bowed out about 2 inches at the top and now I'm staring at it wondering if I underdid the backfill or missed a footing key. Has anyone dealt with a wing wall kicking out like this, and did you tear it out or brace it and re-pour the footing?